Your business may not need more leads. It may need fewer leaks.
This traces what happens to an opportunity after it reaches you — intake, ownership, handoffs, scheduling, field readiness, estimate follow-up, payment, reviews, and referrals. Score each control honestly and you leave with a directional read on where value is escaping and which leak is worth sealing first.
Score each control from 0 to 3.
17 controls, 51 points available. The score is only as good as the honesty behind it, so do not award a 3 without being able to point at the record, timestamp, report, or live workflow that proves it.
Nothing you enter is stored or transmitted. Your answers stay in this browser tab and disappear when you close it.
- 0Open leak
- No dependable process, or it depends entirely on memory.
- 1Patched
- A process exists, but it is manual, inconsistent, or cannot be measured.
- 2Controlled
- Documented and usually followed, but gaps, delays, or disconnected tools remain.
- 3Sealed
- Observable, assigned, measured, and reliably produces the intended outcome.
0 of 17 answered
Running score 0 / 51
0 of 17 controls answered. Running score 0 of 51.
| Score | Condition | What it indicates |
|---|---|---|
| 0–17 | Exposed | Core work depends on memory, individual effort, or disconnected tools. |
| 18–30 | Patched | Important processes exist, but inconsistent handoffs and limited visibility still let value escape. |
| 31–42 | Controlled | The operation is functional and measurable, with specific gaps limiting predictability. |
| 43–51 | Sealed | The core workflow is controlled and observable. |
A high total does not erase a zero. Any 0 on data custody, closeout and payment, or unresolved-issue handling is worth treating as the first priority regardless of where the total lands.